RIVERSIDE PLACE, BRAINTREE

Appointed as full supply and install contractor on a live residential development, following removal of existing blockwork and cavity barriers installed by others. 2,500m² of rendered rainscreen cladding, progressing on schedule with third-party sign-off at every elevation.

Overview

Handshake Icon

CLIENT

Home Group

Cog Icon

Main Contractor

DURKAN REGEN

GBP Icon

Combined Value

£2.6M, SINGLE-PHASE

Timelapse Icon

Duration

12 MONTHS

Shapes Icon

Sector

MULTI-UNIT RESIDENTIAL

List Icon

Status

IN PROGRESS

Flowchart Icon

Systems

RAINSCREEN CLADDING, RENDER, CLADDED SOFFIT SYSTEM SYSTEMS: BENX RAINSCREEN CLADDING SYSTEM, SPS ENVIRONWALL RENDER SYSTEM, EQUITONE PANELS, SIDERISE CAVITY BARRIERS, ALUMINIUM CLADDING

Pictured is Riverside Place, Braintree
Pictured is Riverside Place, Braintree

Contracted to remove existing blockwork and cavity barrier installations and deliver a complete rendered rainscreen system across the full facade. Works include preparation, installation and finishing, with the aim of producing a consistent, high-quality finish across all elevations.

Cavity barriers have been installed throughout in line with manufacturer guidelines, providing effective fire compartmentation within the rainscreen system. Works are progressing under close coordination with third-party inspectors, with section-by-section sign-off achieved at every elevation to date.

Pictured is Riverside Place, Braintree

SYSTEMS AND PRODUCTS.

Benx rainscreen cladding system, SPS Environwall render system, Equitone panels, Siderise cavity barriers.
Pictured is Riverside Place, Braintree
Pictured is Riverside Place, Braintree
“We are achieving seamless sign-off on every section supplied and installed to date.”

Karl Angell, Operations Manager , HKL Special Projects

“Securing the full supply and install contract for Riverside Place is a major achievement for our business.

With 2,500m² of facade area, the complete system design was provided by the client’s architectural and fire engineering team. Winning the tender came down to our ability to manage the supply chain, secure all specified materials within procurement windows, and demonstrate strict site execution capability – particularly around the cavity barrier detailing.

On a live site, managing material delivery schedules and installation teams simultaneously has been critical. Our focus is on ensuring the primary support framework, rendered rainscreen boards, and intumescent horizontal and vertical cavity barriers are supplied and fitted strictly in line with manufacturer installation guidelines – maintaining exact cavity clearances for fire safety and ventilation.

The project is currently progressing on schedule. Through quality assurance protocols and close coordination with third-party inspectors, we are achieving seamless sign-off on every section supplied and installed to date.”