Deakins Place

Details 

A 720 bedroom student accommodation project over 7-storeys in Nottingham with a canal and associated logistical issues the façade had a constant “long walk” applied to our fixing teams around the near ¼ mile building perimeter. The SFS across the total façade was followed with the aluminium windows and doors with associated cladding, firestopping and cavity closure works. A really challenging project but the end product looks superb and the building remains as impressive today as it was when it was completed in September 2022.

Scope of HKL Work

  • Design and install SFS.
  • Design fabricate install Seniors Architectural Systems windows and doors and curtain walling.

Contract Value

£3,500,000

Main Contractor 

Bowmer & Kirkland Ltd

Period at Site 

July 2021 to September 2022